Site Preparation

It is essential to the installation of your building that the following guidelines are followed.

It is crucial that the site upon which your building is to be based is stable, sound, and level across its entirety. Whether you utilise an existing area or construct a new base we recommend you enlist the services of a reputable and qualified building contractor to ensure the area conforms to our requirements.

We regret that if the site is not on firm ground, stable and completely level it will not be possible to construct the building and additional charges will be applicable.

Your Beach hut can be installed onto a new or existing patio constructed using either concrete, brick, paving or decking.

Whichever material you choose to use it is essential that the site is at least the size suggested for your particular building. It is important to note that the structure of the building is circular and the supporting posts extend slightly further than the base.

Download Guidelines
Premier Range Cocoa
Bondai
Miami
Daytona
Spa Range Palm Cove
Sandy Bay

The Above documents require the use of Adobe Acrobat Reader
click here to visit the Adobe Download Section

 

 

 

 

 

 

ACCESS It is also important for installation purposes that, when erecting your building we have a clear safe route to the installation area. We must also insist the installation site is safe and clear from obstruction.